Please Wait...


Loading
MinimizeSearchHeader ImageDeutschHTTPS

Photo Album

Germany 2010

Germany vacation April 1st through 23rd 2010. The trip was extended by the icelandic volcano by a few days. We went to Oldenburg, Bad Zwischenahn, Hamburg, Laboe, Kiel, Lübeck, Munich, Walsrode, Bremerhaven and Groningen in the Netherlands.

2010 April 1 2 3 5 6 7 8 9 10 13 15 16 17 18 20 22

Aquarium (37) Bad Zwischenahn (41) Botanical Garden (55) Bremerhaven (240) Concentration Camp (108) Dachau (149) Easter (37) Erica (17) Flowers (75) Germany (2943) Göttingen (169) Groningen (165) Hamburg (649) Hunte (59) Kiel (35) Laboe (230) Lewin (1) Lübeck (343) Martinikerk (75) Miniature Wonderland (269) Munich (335) Nova (1) Oldenburg (123) Oma's Anniversary (2) Rabea (4) Rita (4) Ruben (1) Smart (1) St. Nikolai (69) Submarines (322) Type VII (157) Type XXI (161) U 2540 (161) U 995 (157) Walsrode (767) Zoo (947)

All

273
CO2 absorption equipment.
274
Air revitalization plant on U-2540 (Wilhelm Bauer)

Air cleaning system

The CO2 enrichment in submerged operations can be measured with the Dräger device onboard. The air cleaning system starts when the CO2 content exceeds 1.5 %. The air cleaner contains calcareous granules which bind the carbon dioxide in the air. One air filter filling is sufficient for about 4 to 5 hours of air purifying. To refill the air cleaner (2 canisters) the filling of 4 potash canisters is necessary. 450 potasch canisters are onboard as replacement.

The calculation is based on the following data: The air volume inside the hull is 900 m³. The crew consists of 60 men. The carbon dioxide output per man and hour amounts to 10 litres during sleep, 20 liters during light, mostly seated activities, 30 litres during heavier activities. Further calculations are based on the average, i.e. 20 litres per hour and man for ordinary submerged operations.

Basis of the oxygen requirement is the CO2 requirement + 10 %.
275
Air revitalization plant.
276
Diesel engine room

Of the machine rooms of the boat, only the back portion of the electric engine room is in its original condition. The Diesel engine room used to house two 6 cylinder MAN diesels, which through the use of a Vulkan clutch and gear box each ran one of the both propellers.

With the conversion of the boat, this diesel-electric machine was put in:
2 12 cylinder MB 820 diesel engines with an output of 600 hp each at 1400 rpm
Make Daimler Benz
and
2 BBC generators with an output of 405 kW
Make BrownBoverie Cie.

This means that at the Federal Navy, the boat ran only using the electic engines. While diving at shallow depths, the diesel engine could be supplied with air using the so-called Snorkel, which, like the head of the periscope, reached above water.
277
In the engine room.
278
In the engine room.
279
Hatch in the engine room.
280
Gauge for the revolutions per minute.
281
Tachometer.
282
In the diesel room.
283
Inside the diesel room.
284
Inside the diesel room.
285
More instruments in the engine room.
286
Gauge of the exhaust pressure in kg / cm².
287
The opened door between the Diesel and electric engine room.
288
Electric engine room.
Slideshow